storyboard-from-scratch
Build a storyboard when you have a Brief 2.0 but no script yet. The output carries a script_status: placeholder flag in frontmatter — Copywriter fills the lines after, then the storyboard moves to script_status: complete.
When to use this vs storyboard-from-script
| Situation | Use |
|---|---|
| RMBC Stage 4 script already produced | storyboard-from-script |
| Brief 2.0 done; want to plan visuals BEFORE locking script (cheaper iteration) | This skill |
| Visual concept is the constraint (e.g., "needs to use a specific stock asset") | This skill |
Pre-flight
brief_pathexists and Brief 2.0 has all 25 sections filled.- Read brand context (
BrandContext,voice-profile,compliance,knowledge-base). - Read PLAYBOOK.md.
Procedure
1. Determine asset shape from asset_target + Brief
vsl-short→ ~60-90s, ugc-talking-head / quick-hook-product-flash / single-take-demo are typical archetypesvsl-3-7min→ 3-7 min, expert-mechanism-vsl / problem-solution-narrative / before-after-transformationvsl-medium→ 10-20 min, full-narrative-ad / long-form-story / long-form-testimonialhook-reel→ 6-15s, lots of hook variants, fast-cut-montage / rapid-cut-compilationdemo→ product-demo-extended / single-take-demo
2. Pick template archetype + hook
Same as storyboard-from-script Steps 1-2.
3. Decompose scenes — but with placeholder VO lines
For each scene, populate visual_prompt, caption, camera_behavior, scene_archetype per the storyboard schema.
For VO: write a scene intent ("Hook: tease the UMP nickname; promise transformation") instead of verbatim VO. Mark script_status: placeholder at the spec level + per-scene audio.vo_status: placeholder.
4. Author storyboard.md + scene-spec.json
Same paths as storyboard-from-script. Frontmatter carries:
script_status: placeholderawaiting_copywriter: truescript_brief_for_copywriter: "<2-sentence summary of what the spoken word needs to do per scene>"
5. Hand off to Copywriter
Surface to user: "Storyboard ready with placeholder VO. Route to Copywriter to write the spoken-word lines per scene intent. After that, the storyboard's script_status flips to complete and it's generation-ready."
6. Append Log entry
Hard rules
- Placeholder VO is explicitly flagged in frontmatter + per-scene — never silently shipped as final.
- Compliance scan still applies — visual claims and implied audio messaging must respect brand compliance.
- Don't lock visual asset choices until script is complete; visual decisions may shift once VO lines are real.
Failure modes
- Brief incomplete — same as
storyboard-from-script. - No clear asset shape — surface options to user.